The Swimming Complex was completed in September, Juche 98(2009), as a monumental edifice. It was gifted to the students and staff of the University by the great leader Comrade
It has three stories underground and two stories above the ground. Its plottage is approximately 25 000m2 and its total building space is 14 370m2.
The swimming pool, 21 meters in width and 50 meters in length, has a 7.5meter-high diving tower with a transparent lift, and the wading pool is equipped with nine douche beds, two water slides and four water jets. Other facilities include baths, a curative gym, a clinic and others.
The water temperature is 27℃ and the room temperature is 28℃. The pool is 4.2m deep below the diving tower and the wading pool is 0.9~1.5m deep.
The capacity of the gallery is 760 seats.
The basement has the equipments and facilities for the water management of the swimming complex.